Overview

DHI DrillSense Mudlogging Unit is certified by the American Bureau of Shipping (ABS) to Class1, Division II and is suitable for use in both offshore and onshore rigs. The cabin is de-signed and manufactured in Singapore, and all hardware and software are thoroughly tested by our team of highly qualified Manufacturing / Service Engineers before mudlogging unit deployment.
The heart of DHI Logging Mudlogging Unit is the DrillSense Data Acquisition System. Our highly trained rig-site geologists and engineers use the powerful and proven DrillSense software to acquire and store lithological data that is combined with engineering data collected from surface sensors to provide integrated formation evaluation, monitoring of drilling performance and operational safety. We also cater a separate work area for the company geologist in our spacious cabin.

Technical Specifications
Manufacturer
DHI Services Inc

Model

ABS 27 ft Cabin

Dimensions

L27ft x W8ft x H8.5ft

Weight

Gross Weight : 12 Metric Tons
Nett Weight : 9 Metric Tons

Input Power

380 to 480 VAC, 3 Phase, 50/60 Hz.

Hazardous Location Certification

ABS certified to Class 1
Division II

Load Test

Cabin is load tested to BS EN-12079-1999 Stan-dard

Magnetic Particle Inspection

Lifting Pad Eyes are MPI to ASME-Sec V Specifi-cation

Lifting Sling
Lifting sling is examined to BS-1290 Standard. Lifting sling is also certified to meet the lifting equipment specifications of Singapore MOM Workplace Safety and Health Regulations
Unit Shell
3mm steel walls, 5mm steel top plate

Welding Procedure Specification (WPS)

In accordance with the requirements of AWS D1.1 Structural Welding Code.

Unit Insulation

Fire and water resistant LBS 300 Rock Wool insulation. Non-combustible tested to BS476. Sound absorption tested to ASTMC518-1991.

Airlock

All cabins are fitted with double doors to provide “airlock”.

Un-interruptible Power Supply (UPS)

A 3KVA UPS is installed in every cabin to provide un-interruptible data logging in the event of rig power interruption or fail-ure.

Emergency Lightings
Two sets of emergency lightings are installed in every unit to provide lightings at main door and emergency escape door areas during emergency or power loss.